Amrumbank West in a German offshore wind farm under construction in the North Sea. It is owned by E.ON. It is located about 35 km northwest of the island of Heligoland and around 18 km south-west of the Amrum Bank sandbank. As of 2015 it consisted of 80 turbines resting at 19–24 m depth.〔 〕 ==Construction== The cost is around 1 billion euros.〔(''Factsheet Amrumbank West'' ) (PDF; 1,2 MB). Eon, retrieved 21 April 2012.〕 The project was delayed 15 months by the lack of power lines.〔(German wind energy plans in the doldrums ). Thenational.ae (6 March 2012). Retrieved on 2015-05-10.〕 The 80 wind turbines are type Siemens SWT-3.6–120 which have a rated power of 3.6 MW and a rotor diameter of 120 meters.〔(''Siemens sichert sich Auftrag für Offshore-Windkraftwerk in Deutschland.'' ) Siemens, 15 December 2011, retrieved 23 Dezember 2011.〕 Offshore construction began in 2013, and the first turbine was installed in February 2015. Until the wind farm is operational, diesel is burnt in generators to maintain the rotors. Two 1250 kW diesel generators were announced as delivered in April 2014.〔(DBR Delivers Power Pack for Amrumbank West ). Offshorewind.biz (8 April 2014). Retrieved on 2015-05-10.〕 The full commissioning of the wind farm is planned for autumn 2015.〔("Amrumbank West: Erste Siemens-Turbine steht im E.ON-Offshore-Windpark" ). ''IWR'', 11 February 2015. Retrieved 11 February 2015.〕
抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Amrumbank West」の詳細全文を読む
スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース |
Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.
|
|